Hick Bros successfully delivered Stages 1A–D and 2A of the Mission Hills Subdivision in Napier, encompassing 196 lots including a retirement village. Works included over 2km of bulk watermain, 3km of internal reticulation, a low-pressure sewer network, and significant stormwater and wastewater infrastructure.

Client
Emerald Hills JV
Status
Work in progress
duration
August 2023 - Ongoing
Location
Napier
volume of earthwork

Heading 1

Heading 2

Heading 3

Heading 4

Heading 5
Heading 6

Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Ut enim ad minim veniam, quis nostrud exercitation ullamco laboris nisi ut aliquip ex ea commodo consequat. Duis aute irure dolor in reprehenderit in voluptate velit esse cillum dolore eu fugiat nulla pariatur.

Block quote

Ordered list

  1. Item 1
  2. Item 2
  3. Item 3

Unordered list

  • Item A
  • Item B
  • Item C

Text link

Bold text

Emphasis

Superscript

Subscript

Number of Lots:

196 Lots + 1 Super Lot

Mission Hills Subdvision

Brief

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Suspendisse varius enim in eros elementum tristique. Duis cursus, mi quis viverra ornare, eros dolor interdum nulla, ut commodo diam libero vitae erat. Aenean faucibus nibh et justo cursus id rutrum lorem imperdiet. Nunc ut sem vitae risus tristique posuere.

Solution

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Suspendisse varius enim in eros elementum tristique. Duis cursus, mi quis viverra ornare, eros dolor interdum nulla, ut commodo diam libero vitae erat. Aenean faucibus nibh et justo cursus id rutrum lorem imperdiet. Nunc ut sem vitae risus tristique posuere.

Hick Bros successfully delivered Stages 1A–D and 2A of the Mission Hills Subdivision in Napier, encompassing 196 lots including a retirement village. Works included over 2km of bulk watermain, 3km of internal reticulation, a low-pressure sewer network, and significant stormwater and wastewater infrastructure. The team installed a new roundabout and completed extensive concrete, roading, and utility works under live traffic conditions.

A staged construction and surfacing approach was implemented to maintain traffic flow and minimise disruption. Stakeholder engagement included letter drops and dedicated community contact, while close collaboration with Napier City Council (NCC) helped ensure smooth approvals and coordination.

Hick Bros exceeded expectations, completing both stages two months ahead of schedule without increasing client costs. Stage 1A–D was delivered $2.73M under budget. Quality assurance processes, including custom Dashpivot ITPs and NCC-supervised testing, ensured high standards. NCC praised the works as the “best overall finish they have seen.”

Strong emphasis was placed on health and safety, particularly around live traffic. Environmental compliance was maintained throughout, with proactive dust suppression and erosion controls. The project demonstrated HBCC’s capability in complex civil works, stakeholder coordination, and delivering ahead of time and under budget while maintaining high quality and safety standards.

Services & scope of work

Waste Water Networks
Stormwater Networks
Water Reticulation
Roading Construction
Concrete Works
Utilities
Bulk earthworks
Erosion and Sediment Controls
Traffic Management

Project highlights

Financial

Stage 1A–D was completed $2.73 million under budget by working collaboratively with the client to identify and reduce excessive or unnecessary scope, leading to direct financial benefits.

Value Added Engineering

Hick Bros led design changes and coordination for the bulk watermain, which were approved by Napier City Council, indicating a proactive approach to engineering refinement that likely improved constructability and reduced long-term maintenance risks.

Programme:

Both Stage 1A–D and Stage 2A were delivered two months ahead of schedule by increasing resources (staff and equipment) without increasing client costs

No items found.

More Projects

View all projects
LEAD Alliance
Alliancing
Value-added Engineering
Client
Kainga Ora
Status

Heading 1

Heading 2

Heading 3

Heading 4

Heading 5
Heading 6

Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Ut enim ad minim veniam, quis nostrud exercitation ullamco laboris nisi ut aliquip ex ea commodo consequat. Duis aute irure dolor in reprehenderit in voluptate velit esse cillum dolore eu fugiat nulla pariatur.

Block quote

Ordered list

  1. Item 1
  2. Item 2
  3. Item 3

Unordered list

  • Item A
  • Item B
  • Item C

Text link

Bold text

Emphasis

Superscript

Subscript

Work in progress
YEar
2018 - Present

LEAD Alliance

View project
Milldale
Earthworks
Civil Construction
Value-added Engineering
Client
Fulton Hogan Land Development
Status

Heading 1

Heading 2

Heading 3

Heading 4

Heading 5
Heading 6

Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Ut enim ad minim veniam, quis nostrud exercitation ullamco laboris nisi ut aliquip ex ea commodo consequat. Duis aute irure dolor in reprehenderit in voluptate velit esse cillum dolore eu fugiat nulla pariatur.

Block quote

Ordered list

  1. Item 1
  2. Item 2
  3. Item 3

Unordered list

  • Item A
  • Item B
  • Item C

Text link

Bold text

Emphasis

Superscript

Subscript

Work in progress
YEar
2017 - Present

Milldale

View project
Millwater
Earthworks
Civil Construction
Value-added Engineering
Client
WFH Properties
Status

Heading 1

Heading 2

Heading 3

Heading 4

Heading 5
Heading 6

Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Ut enim ad minim veniam, quis nostrud exercitation ullamco laboris nisi ut aliquip ex ea commodo consequat. Duis aute irure dolor in reprehenderit in voluptate velit esse cillum dolore eu fugiat nulla pariatur.

Block quote

Ordered list

  1. Item 1
  2. Item 2
  3. Item 3

Unordered list

  • Item A
  • Item B
  • Item C

Text link

Bold text

Emphasis

Superscript

Subscript

Work in progress
YEar
2007 - Present

Millwater

View project
Waikato Expressway
Value-added Engineering
Infrastructure
Alliancing
Client
City Edge Alliance
Status

Heading 1

Heading 2

Heading 3

Heading 4

Heading 5
Heading 6

Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Ut enim ad minim veniam, quis nostrud exercitation ullamco laboris nisi ut aliquip ex ea commodo consequat. Duis aute irure dolor in reprehenderit in voluptate velit esse cillum dolore eu fugiat nulla pariatur.

Block quote

Ordered list

  1. Item 1
  2. Item 2
  3. Item 3

Unordered list

  • Item A
  • Item B
  • Item C

Text link

Bold text

Emphasis

Superscript

Subscript

Complete
YEar
2016 - 2022

Waikato Expressway

View project
Tauhara Geothermal
Infrastructure
Value-added Engineering
Client
Contact Energy
Status

Heading 1

Heading 2

Heading 3

Heading 4

Heading 5
Heading 6

Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Ut enim ad minim veniam, quis nostrud exercitation ullamco laboris nisi ut aliquip ex ea commodo consequat. Duis aute irure dolor in reprehenderit in voluptate velit esse cillum dolore eu fugiat nulla pariatur.

Block quote

Ordered list

  1. Item 1
  2. Item 2
  3. Item 3

Unordered list

  • Item A
  • Item B
  • Item C

Text link

Bold text

Emphasis

Superscript

Subscript

Complete
YEar
2021

Tauhara Geothermal

View project
Te Uku Wind Farm
Infrastructure
Value-added Engineering
Client
Meridian Energy
Status

Heading 1

Heading 2

Heading 3

Heading 4

Heading 5
Heading 6

Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Ut enim ad minim veniam, quis nostrud exercitation ullamco laboris nisi ut aliquip ex ea commodo consequat. Duis aute irure dolor in reprehenderit in voluptate velit esse cillum dolore eu fugiat nulla pariatur.

Block quote

Ordered list

  1. Item 1
  2. Item 2
  3. Item 3

Unordered list

  • Item A
  • Item B
  • Item C

Text link

Bold text

Emphasis

Superscript

Subscript

Complete
YEar
2009 - 2010

Te Uku Wind Farm

View project
Harapaki Wind Farm
Infrastructure
Value-added Engineering
Client
Meridian Energy
Status

Heading 1

Heading 2

Heading 3

Heading 4

Heading 5
Heading 6

Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Ut enim ad minim veniam, quis nostrud exercitation ullamco laboris nisi ut aliquip ex ea commodo consequat. Duis aute irure dolor in reprehenderit in voluptate velit esse cillum dolore eu fugiat nulla pariatur.

Block quote

Ordered list

  1. Item 1
  2. Item 2
  3. Item 3

Unordered list

  • Item A
  • Item B
  • Item C

Text link

Bold text

Emphasis

Superscript

Subscript

Complete
YEar
2021 - 2023

Harapaki Wind Farm

View project
Rangitahi
Civil Construction
Earthworks
Value-added Engineering
Client
Rangitahi Ltd
Status

Heading 1

Heading 2

Heading 3

Heading 4

Heading 5
Heading 6

Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Ut enim ad minim veniam, quis nostrud exercitation ullamco laboris nisi ut aliquip ex ea commodo consequat. Duis aute irure dolor in reprehenderit in voluptate velit esse cillum dolore eu fugiat nulla pariatur.

Block quote

Ordered list

  1. Item 1
  2. Item 2
  3. Item 3

Unordered list

  • Item A
  • Item B
  • Item C

Text link

Bold text

Emphasis

Superscript

Subscript

Complete
YEar
2019 - 2023

Rangitahi

View project
Waiata Shores
Infrastructure
Civil Construction
Value-added Engineering
Client
Fletcher Living
Status

Heading 1

Heading 2

Heading 3

Heading 4

Heading 5
Heading 6

Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Ut enim ad minim veniam, quis nostrud exercitation ullamco laboris nisi ut aliquip ex ea commodo consequat. Duis aute irure dolor in reprehenderit in voluptate velit esse cillum dolore eu fugiat nulla pariatur.

Block quote

Ordered list

  1. Item 1
  2. Item 2
  3. Item 3

Unordered list

  • Item A
  • Item B
  • Item C

Text link

Bold text

Emphasis

Superscript

Subscript

Work in progress
YEar
2016 - 2024

Waiata Shores

View project
Three Kings
Civil Construction
Earthworks
Value-added Engineering
Client
Fletcher Living
Status

Heading 1

Heading 2

Heading 3

Heading 4

Heading 5
Heading 6

Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Ut enim ad minim veniam, quis nostrud exercitation ullamco laboris nisi ut aliquip ex ea commodo consequat. Duis aute irure dolor in reprehenderit in voluptate velit esse cillum dolore eu fugiat nulla pariatur.

Block quote

Ordered list

  1. Item 1
  2. Item 2
  3. Item 3

Unordered list

  • Item A
  • Item B
  • Item C

Text link

Bold text

Emphasis

Superscript

Subscript

Work in progress
YEar
2019 - Present

Three Kings

View project
Beachlands
Infrastructure
Civil Construction
Value-added Engineering
Client
The Neil Group
Status

Heading 1

Heading 2

Heading 3

Heading 4

Heading 5
Heading 6

Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Ut enim ad minim veniam, quis nostrud exercitation ullamco laboris nisi ut aliquip ex ea commodo consequat. Duis aute irure dolor in reprehenderit in voluptate velit esse cillum dolore eu fugiat nulla pariatur.

Block quote

Ordered list

  1. Item 1
  2. Item 2
  3. Item 3

Unordered list

  • Item A
  • Item B
  • Item C

Text link

Bold text

Emphasis

Superscript

Subscript

Work in progress
YEar
2022 - Present

Beachlands

View project